
Rewiring is the job nobody wants until the old wiring gives them no choice. Braytech handles full and partial rewires across the Sutherland Shire and St George, staged so you can keep living in the house while it happens.
267 Google reviews
Upfront pricing
Quoted before we start.
Family owned
Local team, no subcontractors.
Level 2 ASP
Ausgrid + Endeavour approved.
Lifetime labour guarantee
Our work is backed for life.
Same day service
Fast response when it matters.
What the job includes
Whole-house rewiring, or targeted replacement of the worst circuits where a full rewire is not warranted yet.
Homes wired decades ago have too few circuits for modern kitchens, home offices, air conditioning and EV charging. We redesign the circuit layout rather than replicate the old one.
A rewire almost always includes a modern board with full RCD protection, since new cabling into an old fuse board leaves the risk in place.
We coordinate with your builder around sheeting and fit-off, so cabling is in before walls close and fittings go on at the right stage.
Where you are staying in the home, we stage the work so you are not without power for days at a time.
Compliance documentation for the work, plus a labelled board you can actually read.
When to call us
Rewiring is usually driven by one of these.
CALL 02 9055 8581How we work
We inspect the existing wiring, board and access, then set out whether a full or partial rewire is the right call.
You get the price, the sequence and the expected outages before anything begins.
New cabling is run, with access made and made good as agreed. On renovations this is timed with your builder.
New switchboard installed, fittings fitted off, everything tested and labelled, and compliance documentation issued.
Why Braytech

4.9from 267 Google reviews
The strongest signs are the age and type of the cable insulation, an original fuse board, and repeated faults across different circuits. An inspection will tell you whether a full rewire is warranted or whether replacing the worst circuits and the board gets you most of the benefit.
In most cases yes. We stage the work area by area so power is restored to the parts of the house you are living in each evening. We set out the expected outages when we quote.
Almost always. Running new cabling back to an old fuse board leaves the biggest risk untouched, so a modern board with full RCD protection is normally part of the scope.
Less than most people expect. We use existing cavities, roof and floor space wherever possible and agree any access points with you first, so patching is limited and predictable.
Yes. We coordinate rough-in before sheeting and return for fit-off at the right stage, which is how we work on most Shire and St George renovations.
We cover every suburb in both regions. Start with your area below, or see the full list.
Call 02 9055 8581 or send the details and we’ll come back to you.